Image of the Day

332 / 364

Armstrong pilothouse

Bridge to the Future

The inside of the bridge of R/V Neil Armstrong was left to dry after workers sprayed a thermal coating that will prevent condensation buildup on the steel bulkheads and ceiling when the ship is at sea. The bridge is the navigational center of the 238-foot ship, and will house state-of-the-art equipment such as GPS, radar, and controls for the ship’s two variable-pitch propellers and rudders. The ship is under construction in Anacortes, Washington and will join the fleet operated by the University National Oceanographic Laboratory System (UNOLS) after it is launched in 2014. (Photo by Gary McGrath, Woods Hole Oceanographic Institution)


Image and Visual Licensing

Text, images, graphics and other material contained on this website are subject to copyright. For more information or to license material, please contact the WHOI Media Relations Office, or (508) 289-3340.

Explore Visual WHOI

Search multimedia database

License our Visuals