Due to the proximity to the Fram Strait, the ITP profiler was configured to operate with an accelerated sampling schedule of 3 one-way profiles each day. In the surface package, the GPS receiver was powered every hour to obtain locations, and buoy temperature and battery voltage status were recorded. The unit was deployed to the east of the Lomonosov Ridge and drifted to the south largely paralleling the ridge. Early on (as delineated in Data Processing section), features perhaps resembling remnant thermohaline staircases were observed, perhaps indicating that the system briefly crossed over a front separating Atlantic and Pacific sectors. Without warning, the underwater unit suddenly ceased ringing the surface unit after 53 days. The plots to the right are of the final, calibrated, edited data (as opposed to the raw data presented on the active instrument pages). See the Data Products tab to the left for descriptions of the three levels (I, II, III) of data processing and to access all data. Last updated: April 23, 2013 | |||||||||||||||||||
Copyright ©2007 Woods Hole Oceanographic Institution, All Rights Reserved, Privacy Policy. |