Woods Hole Oceanographic Institution
Cruise Planning Questionnaire
AR30-05
Ship
RV Neil ArmstrongVehicles
Cruise Party
William Hodgkiss: Chief Scientist, Principal Investigator9500 Gilman Dr. La Jolla, CA US 92093-0701
+1 858 534 1798
whodgkiss@ucsd.edu
Departure: Reykjavik, Iceland on Aug 4, 2018
Arrival: Reykjavik, Iceland on Aug 21, 2018
Mobilization Date: Aug 1, 2018
Demobilization Date: Aug 22, 2018
Supporting documentation:
»WHodgkiss_MFN_Exp_Aug18.pdfOperations Area: Norwegian Sea ~300 nm ENE of Iceland
Lat/Lon: 66° 45.0′ N / 1° 30.0′ W
Depth Range: 2000 / 4000
Will the vessel be operating within 200 NM of a foreign country? N/A
Are visas or special travel documents required? no
Science objectives
Observation of the mid-frequency ambient noise spatial structure and temporal fluctuation characteristics.Science Activities
Thermistor string deployment/recovery. Acoustic array deployment/recovery. Acoustic source transmissions (fixed stations and source tows).Pre-cruise planning meeting: Teleconference
Stations:
Funding Agency: ONR/NAVY #ONR 17-C-7049
- added ONR/NAVY #ONR 17-C-7049 on Mar 5, 2018 4:09 PM by
<Could not load the preview of Funding data >
R/V Armstrong
Shipboard Equipment
Bathymetry System 12 kHzADCP 300 kHz
Sippican XBT System (Mark 21)
Bathymetry System 3.5 kHz
ADCP 150 kHz
A-Frame
EM122 (12 kHz) Multibeam Echosounder
WAMOS
Crane
Shipboard Equipment Notes:
Shipboard Communication
Basic Internet access via HiSeasNetShipboard Communication Notes:
CTD/Water Sampling
SBE43 oxygen sensor911+ Rosette 24-position, 10-liter bottle Rosette with dual T/C sensors
Critical CTD Sensors:
MET Sensors
PrecipitationWind speed and direction
Storage Notes:
Navigation Notes:
Winch Notes:
Please note that we will need 220V 3P 20A service on deck for our electric winch and air supply for 2 air tuggers (BU7A).
Wire Notes:
Slip ring required? no | Number of conductors: |
Non-standard wire required? no | Type: |
Traction winch required? no | Describe: |
Other Science Vans:
Over the Side Equipment
Will you be bringing any equipment (winches, blocks, etc.) that lowers instruments over the side? yesDetails: Winch for acoustic array deployment and acoustic sound source deployment.
Special Requirements
Elecrical Power: yes | Identify: Please note that we will need 220V 3P 20A service on deck for our electric winch |
Equipment Handling: no | Identify: |
Inter/intraship Communications: no | Identify: |
Science Stowage: no | Identify: |
Water: no | Identify: |
Additional Cruise Items/Activities
Explosive Devices: no Portable Air Compressors: no Flammable Gases: no |
Small Boat Operations: no SCUBA Diving Operations: no |
Hazardous Material
Will hazardous material be utilized? yes
Describe deployment method and quantity:
Lithium batteries used for powering the acoustic array.
Radioactive Material
Radioiosotopes: noAdditional Information
Is night time work anticipated on this cruise? no
Specialized tech support (Seabeam, coring, other):
Other required equipment and special needs:
Mob/Demob Special Requirements: We will unload the container on the dock and will need a large forklift (> 5000 lbs capacity). We can operate the forklift if allowed, otherwise we will need an operator. Need ship crane support to load equipment on ship (max load 5000 lbs). We will plan to store the empty container on the dock if allowed, otherwise we would need to store on the ship for the experiment.
Date Submitted: Mar 5, 2018 5:14 PM