| 3 Sept. |
|
|
introduction |
group mtg with Alvin pilot |
| 10 Sept. |
|
|
prep. control samples (air) |
tutorial on epoxies/adhesives |
| 17 Sept. |
|
|
prep. control samples (water) |
tutorial, continued |
| 24 Sept. |
|
|
prep. & deploy sea samples |
Dr. Tivey (WHOI) brainstorming |
| 1 Oct. |
|
|
prep. & deploy continued |
test applicator prototype |
| 8 Oct. |
|
|
tutorial |
Dr. Pocius visit (3M Co.) |
| 15 Oct. |
|
|
design applicator, begin construction |
create format final report |
| 29 Oct. |
|
|
finish applicator prototype |
speaker from local marine business |
| 3 Dec. |
|
|
presentations (all students) |
|