3 Sept. |
|
|
introduction |
group mtg with Alvin pilot |
10 Sept. |
|
|
prep. control samples (air) |
tutorial on epoxies/adhesives |
17 Sept. |
|
|
prep. control samples (water) |
tutorial, continued |
24 Sept. |
|
|
prep. & deploy sea samples |
Dr. Tivey (WHOI) brainstorming |
1 Oct. |
|
|
prep. & deploy continued |
test applicator prototype |
8 Oct. |
|
|
tutorial |
Dr. Pocius visit (3M Co.) |
15 Oct. |
|
|
design applicator, begin construction |
create format final report |
29 Oct. |
|
|
finish applicator prototype |
speaker from local marine business |
3 Dec. |
|
|
presentations (all students) |
|