Deploying the ULF and elevator. Click on image for full size photo. |
Pictures of ULF begin deployed |
The ULF elevator resting on the bottom. |
The ULF elevator descent weights. Jason removes these by pulling a pin prior to moving the elevator. |
|
The ULF after release of the elevator floats. The remaining glass balls allow the separate sensor package to be moved. |
Jason retrieving the ULF connector which is plugged into the j-box. |
|
Jason plugging the ULF into the j-box. |
The ULF with the sensor floats deployed. |
|
Jason moving the sensor package to the caisson. |
Jason placing the sensor package in the caisson. |
|
View of the caisson with the sensor package after installation. |
The hydrophone elevator on the bottom. |
|
Jason pulling the hydrophone cable to plug into the j-box. |