1998 cable recovery and redeployment


 

3. After recovering Jason, this grapnel was attached to the end of the ship's 9/16" trawl wire and used to snag the cable at a point 5 km to the west of the cut point and bring it to the surface. This operation took about 24 h and involved very high (up to 20,000 lb) tensions in the wire.