1998 cable recovery and redeployment


 

12. The ULF seismometer package resting on the deployment anchor after being launched as an elevator using glass ball floats above it. The anchor is disconnected and Jason then picks up the entire unit (which weighs about 40 pounds in water) and moves it to the junction box site.