Woods Hole Oceanographic Institution
Cruise Planning Questionnaire
El Faro VDR search
Ship
R/V AtlantisVehicles
AUV SentryCruise Party
Morgan Turrell: Chief Scientist, Principal InvestigatorNTSB USA
+1 202 314 6106
morgan.turrell@ntsb.gov
Departure: Bridgetown Barbados on Apr 15, 2016
Arrival: Woods Hole MA on May 5, 2016
Mobilization Date: Apr 14, 2016
Demobilization Date: May 6, 2016
Supporting documentation:
Operations Area:
Lat/Lon:
Depth Range: min / max (m)
Will the vessel be operating within 200 NM of a foreign country? no
Science objectives
This is a 10 day AUV search of the El Faro's Voyage Data Recorder (VDR). Sentry will be the primary piece of equipment. If warranted the Alvin observation vehicle will be deployed for live video feed.Science Activities
AUV Sentry operations - continous.Alvin Observation Vehilcle if needed
Telepresense for NTSB updates and news from ship to shore.
Possible media visiting ship while on station (TBD).
Pre-cruise planning meeting: Teleconference
Stations:
Funding Agency: NSF #01234
- added NSF #01234 on Feb 29, 2016 1:55 PM by
<Could not load the preview of Funding data >
R/V Atlantis
Shipboard Equipment
Bathymetry System 12 kHzADCP 75 kHz
Transponder Navigation - Sonardyne USBL
Navigation - Heading
Multibeam
Navigation - Position
Shipboard Communication
Basic Internet access via HiSeasNetIs there an expectation to use Skype or any other real-time video conference program?
Critical CTD Sensors:
Storage Notes:
Navigation
Will you be using Long Base Line (LBL) navigation? no
Will you be using Ultra-short baseline (USBL) navigation for other than Alvin operations? no
Navigation Notes:
Winch Notes:
Wire Notes:
Slip ring required? no | Number of conductors: |
Non-standard wire required? no | Type: |
Traction winch required? no | Describe: |
Other Science Vans:
Other Science Vans:Science Van 1 | |||
Type/size: Sentry tool van | Location: Main Deck | ||
Water: | Power: | ||
Science Van 2 | |||
Type/size: Sentry Vehicle Van | Location: 01 Deck | ||
Water: | Power: |
Specialized Deck Equipment
Mooring Deployment/Recovery Equipment Required: no | Type: |
Cruise Specific Science Winch Required: no | Type: |
Nets Required: no | Type: |
Over the Side Equipment
Will you be bringing any equipment (winches, blocks, etc.) that lowers instruments over the side? noSpecial Requirements
Elecrical Power: yes | Identify: Sentry Tool Van |
Equipment Handling: no | Identify: |
Inter/intraship Communications: no | Identify: |
Science Stowage: no | Identify: |
Water: no | Identify: |
Additional Cruise Items/Activities
Explosive Devices: no Portable Air Compressors: no Flammable Gases: no |
Small Boat Operations: no SCUBA Diving Operations: no |
Hazardous Material
Will hazardous material be utilized? no
Radioactive Material
Radioiosotopes: noAdditional Information
Is night time work anticipated on this cruise? yes
Specialized tech support (Seabeam, coring, other):
Other required equipment and special needs:
AUV Sentry
Site Survey
Will you provide detailed charts of the work area(s)? noCurrent Chart(s):
If no, will you need Sentry to generate maps of the work area(s)? no
Will you need post-dive maps of the work area generated? no
Navigation
Will you be using Long Base Line (LBL) navigation? no
Will you be using Ultra-short baseline (USBL) navigation? yes
Will you be using Doppler/GPS navigation? yes
What type of samples do you expect to collect?
Science Supplied Equipment
Are you supplying equipment to be used with AUV Sentry? no
Has this equipment been used on Sentry before? no
Please give a brief description of the equipment, its intended purpose, the cruise # it was last used on if any and its deployment method.
Does this equipment use an external pressure housing? no
Has the pressure case been tested to the anticipated depth of deployment? no
Air weight(s) of this equipment?
Water weight(s) of this equipment?
Does the equipment require data or a power interface from the vehicle?
no
Does the equipment meet the electrical requirements of the Sentry User Manual?
no
Cameras & Video
Digital Still Camera: ColorAdditional Information
Brief operations description or comments:Date Submitted: Feb 29, 2016 2:00 PM