CMO SuperBASS Report (orientation)

The sampling volume of the ADV sensors was measured as 35 cm above deck and placed 1.3 meters from the BASS array (with the processing unit nearest the leg). The distance between each ADV sensor was 2.2 meters.

Deployment I: 8/18/96 - 9/27/96

Deployment II: 10/7/96 - 12/27/96

Deployment III: 1/97 - 4/9/97

Deployment IV: 4/17/97 - 6/10/97

Deployment V: 6/16/97 - 8/14/97
 
 

Return to CMO SuperBASS Tripod Report

 * This page maintained by J.J.Fredericks

Last Modified: 2 March, 1998