Please note: You are viewing the unstyled version of this website. Either your browser does not support CSS (cascading style sheets) or it has been disabled. Skip navigation.

Grapple

  Email    Print  PDF  Change text to small (default) Change text to medium Change text to large

» Click image to enlarge

The Allied systems Grapple being assembled for the first time onboard Knorr at the WHOI pier.

Grapple testing underway at WHOI with the Corehead installed.  The Grapple assembly also includes a maneuverable work platform or man-basket that is used for a variety of functions during rigging procedures.

The Grapple at its centerline stern position with the Long Core vertical during Sea Trials in September 2007.

The Grapple maintains complete control of the massive coring system at all times


Grapple door

Control panel for Grapple and A-frame

Grapple in starboard position with Long Core stowed on its rail support system onboard Knorr.




Last updated: May 7, 2008
 


whoi logo

Copyright ©2007 Woods Hole Oceanographic Institution, All Rights Reserved, Privacy Policy.
Problems or questions about the site, please contact webdev@whoi.edu