Please note: You are viewing the unstyled version of this website. Either your browser does not support CSS (cascading style sheets) or it has been disabled. Skip navigation.

Launch & Recovery

  Email    Print  PDF  Change text to small (default) Change text to medium Change text to large

The rope load is transferred to the stern sheave, and afterwards lowering of the equipment to the seafloor will continue.

20 of 31
The rope load is transferred to the stern sheave, and afterwards lowering of the equipment to the seafloor will continue. (Woods Hole Oceanographic Institution)

« previous | gallery | next »

Last updated: May 7, 2008
 


whoi logo

Copyright ©2007 Woods Hole Oceanographic Institution, All Rights Reserved, Privacy Policy.
Problems or questions about the site, please contact webdev@whoi.edu