Woods Hole Oceanographic Institution
Cruise Planning Synopsis
OC469--2 | |
Ship | |
| R/V Oceanus | |
Cruise Party | |
| Karen Grissom: Chief Scientist, Principal Investigator NOAA/NDBC Bldg 3202 Rm 111A Stennis Space Center, MS United States 39529 +1 228 688 1325 karen.grissom@noaa.gov | |
| - added Karen Grissom as Chief Scientist on Sep 29, 2010 3:02 PM by Eric Benway | |
| - added Karen Grissom as Principal Investigator on Sep 29, 2010 3:02 PM by Eric Benway |
Departure: Oct 23, 2010 | |
| Bridgetown, Barbados | |
Arrival: Nov 2, 2010 | |
| Woods Hole, MA | |
Operations Area | |
| Lat/Lon: 15° 15.366′ N / 68° 14.266′ W | |
| - set lat to 15° 15.366′ N, set lon to 68° 14.266′ W on Sep 29, 2010 3:02 PM by Eric Benway | |
| Depth Range: 4520 / max (m) | |
| - set min to 4520, set max to max (m) on Sep 29, 2010 3:02 PM by Eric Benway | |
| Will the vessel be operating within 200 NM of a foreign country? | Just outside the EEZ line of Puerto Rico |
| - Just outside the EEZ line of Puerto Rico on Sep 29, 2010 3:02 PM by Eric Benway | |
| Are visas or special travel documents required? | no |
| - set to no on Sep 29, 2010 3:02 PM by Eric Benway | |
Science Objectives | |
| Objective will be to successfully deploy the next NOAA DART BUOY #42407. At position LAT 15 - 15.366 N LONG 068 - 14.266 W. Depth of 4520 meters. | |
| - Objective will be to successfully deploy the next NOAA DART BUOY #42407. At position LAT 15 - 15.366 N LONG 068 - 14.266 W. Depth of 4520 meters. on Sep 29, 2010 3:02 PM by Eric Benway | |
Science Activities | |
| NOAA DART mooring technicians will conduct the deployment on board Oceanus in conjunction with the ships crew. Deployment will take aproximately 4- 8 hours and will need to remain on station aproximately 12 - 16 hours subsequently to monitor the mooring and calibrate the tramsmission from the buoy. | |
| - NOAA DART mooring technicians will conduct the deployment on board Oceanus in conjunction with the ships crew. Deployment will take aproximately 4- 8 hours and will need to remain on station aproximately 12 - 16 hours subsequently to monitor the mooring and calibrate the tramsmission from the buoy. on Sep 29, 2010 3:02 PM by Eric Benway | |
Additional Info | |
| Pre-cruise Planning Meeting: Teleconference | |
| - Teleconference on Sep 29, 2010 3:02 PM by Eric Benway | |
| Media personnel on board: none | |
| - none on Sep 29, 2010 3:02 PM by Eric Benway | |
| n/a | |
| - n/a on Sep 29, 2010 3:02 PM by Eric Benway | |
Stations: | |
| Dart Buoy 42407 Distance: 520 Days: 24 Latitude: 15° 15.37 N Longitude: 68° 14.27 W | |
| - added Name: Dart Buoy 42407, Lat: 15° 15.37 N, Lon: 68° 14.27 W, Distance: 520, Days: 24 on Sep 29, 2010 3:02 PM by Eric Benway | |
Supporting documentation: | |
| »GRISSOM_42407_deck_plan_Oct_2010.PNG | |
| »DART_42407_100628.pdf | |
| »42407_Pos_pic.jpg | |
| - added GRISSOM_42407_deck_plan_Oct_2010.PNG on Sep 29, 2010 5:25 PM by Eric Benway | |
| - | |
| - added GRISSOM_42407_Oct_2010.PNG on Sep 29, 2010 5:24 PM by Eric Benway | |
| - added 42407_Pos_pic.jpg on Sep 29, 2010 3:02 PM by Eric Benway | |
| - added DART_42407_100628.pdf on Sep 29, 2010 3:02 PM by Eric Benway | |
| Notes: 2 day transit to station. ETA am Oct 25 1 day deployment work. ETD station pm Oct 26 Stop offshore (at least 3nm) San Juan Puerto Rico to have mooring techs disembarked by shore side vessel. OCT 27. Oct 27 depart San Juan for Woods Hole. | |
| - -added 2 day transit to station. ETA am Oct 25 1 day deployment work. ETD station pm Oct 26 Stop offshore (at least 3nm) San Juan Puerto Rico to have mooring techs disembarked by shore side vessel. OCT 27. Oct 27 depart San Juan for Woods Hole. on Sep 29, 2010 3:04 PM by Eric Benway | |
Funding |
| Funding Agency: NOAA | |
| Grant or contract number: ISA000 |
Scientific Instrumentation for R/V Oceanus |
Shipboard Equipment | |||||||||||
| Bathymetry System 12 kHz, | |||||||||||
| Bathymetry System 3.5 kHz , | |||||||||||
| ADCP 150 kHz, | |||||||||||
| ADCP 75 kHz | |||||||||||
| -added Bathymetry System 12 kHz on Sep 29, 2010 3:02 PM by Eric Benway | |||||||||||
| -added Bathymetry System 3.5 kHz on Sep 29, 2010 3:02 PM by Eric Benway | |||||||||||
| -added ADCP 75 kHz on Sep 29, 2010 3:02 PM by Eric Benway | |||||||||||
| -added ADCP 150 kHz on Sep 29, 2010 3:02 PM by Eric Benway | |||||||||||
Critical CTD Sensors | |||||||||||
| Storage Notes: none | |||||||||||
| - added none on Sep 29, 2010 3:02 PM by Eric Benway | |||||||||||
Navigation | |||||||||||
| Will you be using Long Base Line (LBL) navigation? | no | ||||||||||
| - added no on Sep 29, 2010 3:02 PM by Eric Benway | |||||||||||
| How many nets? | 0 | ||||||||||
| How many tansponders? | 0 | ||||||||||
| Will you be using Doppler/GPS navigation? | no | ||||||||||
| - added no on Sep 29, 2010 3:02 PM by Eric Benway | |||||||||||
Winches | |||||||||||
| Mooring / TSE winch | |||||||||||
| -added Mooring / TSE winch on Sep 29, 2010 3:02 PM by Eric Benway | |||||||||||
| Winch Notes:
We will be using the NOAA capstan that was used on the previous cruise in September. | |||||||||||
| - added We will be using the NOAA capstan that was used on the previous cruise in September. on Sep 29, 2010 3:02 PM by Eric Benway | |||||||||||
Standard Oceanographic Cables | |||||||||||
| |||||||||||
Specialized Deck Equipment | |||||||||||
| |||||||||||
Over the Side Equipment | |||||||||||
| Will you be bringing any equipment (winches, blocks, etc.) that lowers instruments over the side? | no | ||||||||||
Special Requirements | |||||||||||
| |||||||||||
Additional Cruise Items/Activities | |||||||||||
| Explosive Devices: | no | ||||||||||
| Portable Air Compressors: | no | ||||||||||
| Flammable Gases: | no | ||||||||||
| Small Boat Operations: | no | ||||||||||
| SCUBA Diving Operations: | no | ||||||||||
Hazardous Material | |||||||||||
| Will hazardous material be utilized? | no | ||||||||||
| - added no on Sep 29, 2010 3:02 PM by Eric Benway | |||||||||||
| Describe deployment method and quantity: | |||||||||||
Radioactive Material | |||||||||||
| Radioiosotopes: | no | ||||||||||
Additional Information | |||||||||||
| Is night time work anticipated on this cruise? | no | ||||||||||
| - added no on Sep 29, 2010 3:02 PM by Eric Benway | |||||||||||
| Specialized tech support (Seabeam, coring, other): NOAA will provide mooring techs | |||||||||||
| - added NOAA will provide mooring techs on Sep 29, 2010 3:02 PM by Eric Benway | |||||||||||
| Other required equipment and special needs: | |||||||||||
Checklist & Notes |
Checklist | |
| U.S. Customs Form: | no |
| - added no on Sep 29, 2010 3:10 PM by Eric Benway | |
| Diplomatic Clearance: | no |
| - added no on Sep 29, 2010 3:10 PM by Eric Benway | |
| Date Submitted: | |
| Date Approved: | |
| Agent Information: | |
| BRIDGETOWN BARBADOS: Master R/V OCEANUS Attn: Scientist's Name c/o DaCosta Mannings Inc. Brandons St. Michael BARBADOS Contact: Glyne St. Hill, Manager Email: gsthill@dmishipping.com Phone:(246) 430-4804 Fax: (246) 431-0051 Contact: David Priddee, Operations Manager Email Address: dpriddee@dmishipping.com Tel. no. (246) 430-4819 Cell no. (246) 231-5348 Contact: Arlin Kellman, Assistant Operations Manager Email Address: akellman@dmishipping.com Tel. No. (246) 430-4825 Cell no. (246) 230-4353 Primary Contact: Anthony Oliver, Operations Coordinator* Email Address: logistics@dmishipping.com Tel. no. (246) 430-4881 Cell no. (246) 231-5382 Fax: (246) 431-0878 *Note: All requests and correspondence should be sent to Anthony Oliver at the email address above with copies to David Priddee and Arlin Kellman. Agent and WHOI contacts should be copied on all communications. It is requested that shipment information of any equipment be communicated to the Agent and to all WHOI contacts ---------------------------- WOODS HOLE MA: Master R/V OCEANUS Attn: Scientist's Name c/o WHOI 266 Woods Hole Rd. Woods Hole, MA 02543 Contact: Eric Benway Phone: (508) 289-3770 Fax: (508) 457-2185 Email: ebenway@whoi.edu | |
| - added BRIDGETOWN BARBADOS: Master R/V OCEANUS Attn: Scientist's Name c/o DaCosta Mannings Inc. Brandons St. Michael BARBADOS Contact: Glyne St. Hill, Manager Email: gsthill@dmishipping.com Phone:(246) 430-4804 Fax: (246) 431-0051 Contact: David Priddee, Operations Manager Email Address: dpriddee@dmishipping.com Tel. no. (246) 430-4819 Cell no. (246) 231-5348 Contact: Arlin Kellman, Assistant Operations Manager Email Address: akellman@dmishipping.com Tel. No. (246) 430-4825 Cell no. (246) 230-4353 Primary Contact: Anthony Oliver, Operations Coordinator* Email Address: logistics@dmishipping.com Tel. no. (246) 430-4881 Cell no. (246) 231-5382 Fax: (246) 431-0878 *Note: All requests and correspondence should be sent to Anthony Oliver at the email address above with copies to David Priddee and Arlin Kellman. Agent and WHOI contacts should be copied on all communications. It is requested that shipment information of any equipment be communicated to the Agent and to all WHOI contacts ---------------------------- WOODS HOLE MA: Master R/V OCEANUS Attn: Scientist's Name c/o WHOI 266 Woods Hole Rd. Woods Hole, MA 02543 Contact: Eric Benway Phone: (508) 289-3770 Fax: (508) 457-2185 Email: ebenway@whoi.edu on Sep 29, 2010 3:10 PM by Eric Benway | |
| Countries: | |
| Barbados - no science work taking place inside EEZ. Only embarkation | |
| - added Barbados - no science work taking place inside EEZ. Only embarkation on Sep 29, 2010 3:10 PM by Eric Benway | |
| Notes: | |
| NOAA will provide all BOL's and Commerical invoices for their gear and have for arrival into Woods Hole Ma. Nov 2. | |
| - added NOAA will provide all BOL's and Commerical invoices for their gear and have for arrival into Woods Hole Ma. Nov 2. on Sep 29, 2010 3:10 PM by Eric Benway | |
| Isotope Use Approval: | no |
| - added no on Sep 29, 2010 3:10 PM by Eric Benway | |
| Isotope Notes: | |
| SCUBA Diving: | no |
| - added no on Sep 29, 2010 3:10 PM by Eric Benway | |
Checklist | |
| SSSG Tech: | |
| Rob Hagg (m) | |
| - added Rob Hagg (m) on Sep 29, 2010 3:10 PM by Eric Benway | |
| Loading: afternoon of Oct 22nd ( 4 - 6 hrs) Using Decosta Mannings as agent for their container and gear. Off loading gear will be in Woods Hole Nov 2 -3, 2010. | |
| - added Loading: afternoon of Oct 22nd ( 4 - 6 hrs) Using Decosta Mannings as agent for their container and gear. Off loading gear will be in Woods Hole Nov 2 -3, 2010. on Sep 29, 2010 3:10 PM by Eric Benway | |