OC463 | |
Ship | |
| R/V Oceanus | |
Cruise Party | |
| Christopher Baxter: Principal Investigator URI - Department of Ocean/Civil and Environmental Engineering Narragansett, , RI 02882 +1 401 874 6575 baxter@egr.uri.edu Jason Chaytor: Chief Scientist USGS Woods Hole Science Center 384 Woods Hole Road Woods Hole , Ma 02543-1598 +1 508 457 2351 jchaytor@usgs.gov | |
| - added Jason Chaytor as Chief Scientist on Jun 3, 2010 11:09 AM by Eric Benway | |
| - added Christopher Baxter as Principal Investigator on Jun 3, 2010 11:09 AM by Eric Benway |
Departure: Jun 15, 2010 | |
| Woods Hole - DEPARTURE TBD (6/3/10) | |
Arrival: Jun 21, 2010 | |
| Woods Hole | |
Operations Area | |
| off shore of Rhode Island | |
| - changed off shore of Rhode Island to New Jersey to off shore of Rhode Island on Jun 9, 2010 3:08 PM by Eric Benway | |
| - off shore of Rhode Island to New Jersey on Jun 3, 2010 11:09 AM by Eric Benway | |
| Lat/Lon: | |
| Depth Range: 500 / 2500 | |
| - set min to 500, set max to 2500 on Jun 3, 2010 11:09 AM by Eric Benway | |
| Will the vessel be operating within 200 NM of a foreign country? | NO |
| - NO on Jun 3, 2010 11:09 AM by Eric Benway | |
| Are visas or special travel documents required? | no |
| - set to no on Jun 3, 2010 11:09 AM by Eric Benway | |
Science Objectives | |
| Propose to conduct a 7-day cruise to obtain gravity cores at two locations off the coast of Rhode Island where we have identified submarine landslides with a possible link to seismically induced tsunamis. | |
| - changed Propose to conduct a 7-day cruise to obtain gravity cores at two locations off the coast of Rhode Island and New Jersey where we have identified submarine landslides with a possible link to seismically induced tsunamis. to Propose to conduct a 7-day cruise to obtain gravity cores at two locations off the coast of Rhode Island where we have identified submarine landslides with a possible link to seismically induced tsunamis. on Jun 9, 2010 3:08 PM by Eric Benway | |
| - Propose to conduct a 7-day cruise to obtain gravity cores at two locations off the coast of Rhode Island and New Jersey where we have identified submarine landslides with a possible link to seismically induced tsunamis. on Jun 3, 2010 11:09 AM by Eric Benway | |
Science Activities | |
| Jumbo piston coring and box coring. | |
| - Jumbo piston coring and box coring. on Jun 3, 2010 11:09 AM by Eric Benway | |
Additional Info | |
| Pre-cruise Planning Meeting: Visit WHOI | |
| - Visit WHOI on Jun 3, 2010 11:09 AM by Eric Benway | |
| Meeting Notes: Chris Baxter's cruise just added to schedule on 6/2/10. | |
| - Chris Baxter's cruise just added to schedule on 6/2/10. on Jun 3, 2010 11:09 AM by Eric Benway | |
Stations: | |
| Rhode Island Distance: null Days: null Latitude: 39° 45.0 N Longitude: 70° 56.0 W | |
| - removed | |
| - added Name: Rhode Island, Lat: 39° 45.0 N, Lon: 70° 56.0 W, Distance: , Days: on Jun 9, 2010 3:08 PM by Eric Benway | |
| - added Name: New Jersey, Lat: 38° 53.0 N, Lon: 72° 32.0 W, Distance: , Days: added Name: Rhode Island, Lat: 39° 45.0 N, Lon: 70° 56.0 W, Distance: , Days: on Jun 3, 2010 11:09 AM by Eric Benway | |
Supporting documentation: | |
| »Jumbo_Piston_track_deck_layout._prelim.doc | |
| »Station_picture.jpg | |
| »BAXTER_et_al-RIEP_FY10.pdf | |
| »Endeavor_shipment_2010_2.jpg | |
| »Endeavor_shipment_2010_1.jpg | |
| - added Jumbo_Piston_track_deck_layout._prelim.doc on Jun 8, 2010 11:16 AM by Eric Benway | |
| - added Station_picture.jpg on Jun 8, 2010 11:16 AM by Eric Benway | |
| - added BAXTER_et_al-RIEP_FY10.pdf on Jun 3, 2010 11:09 AM by Eric Benway | |
| - | |
| - added Station_map.bmp on Jun 3, 2010 11:09 AM by Eric Benway | |
| - added Endeavor_shipment_2010_1.jpg on Jun 3, 2010 11:09 AM by Eric Benway | |
| - added Endeavor_shipment_2010_2.jpg on Jun 3, 2010 11:09 AM by Eric Benway | |
| Notes: Cutting deck bolt holes and welding plates to track will begin on Friday June 11 Full Mob will begin on Sunday June 13 and June 14 | |
| - -added Cutting deck bolt holes and welding plates to track will begin on Friday June 11 Full Mob will begin on Sunday June 13 and June 14 on Jun 8, 2010 11:17 AM by Eric Benway | |
Funding |
| Funding Agency: USGS | |
| Grant or contract number: 48002103 |
Scientific Instrumentation for R/V Oceanus |
Shipboard Equipment | |||||||||||
| Bathymetry System 3.5 kHz , | |||||||||||
| 12 kHz Pinger for Wire Use | |||||||||||
| -added Bathymetry System 3.5 kHz on Jun 3, 2010 11:09 AM by Eric Benway | |||||||||||
| -added 12 kHz Pinger for Wire Use on Jun 3, 2010 11:09 AM by Eric Benway | |||||||||||
Critical CTD Sensors | |||||||||||
Sediment Sampling | |||||||||||
| Piston corers, | |||||||||||
| Box corer | |||||||||||
| -added Piston corers on Jun 3, 2010 11:09 AM by Eric Benway | |||||||||||
| -added Box corer on Jun 3, 2010 11:09 AM by Eric Benway | |||||||||||
| Storage Notes: Recovered cores to be sectioned and stored vertically in collapseable wire baskets (3 supplied by USGS). Location of the baskets to be determined in consultation with ship. | |||||||||||
| - added Recovered cores to be sectioned and stored vertically in collapseable wire baskets (3 supplied by USGS). Location of the baskets to be determined in consultation with ship. on Jun 3, 2010 11:09 AM by Eric Benway | |||||||||||
Navigation | |||||||||||
| Will you be using Long Base Line (LBL) navigation? | no | ||||||||||
| - added no on Jun 3, 2010 11:09 AM by Eric Benway | |||||||||||
| How many nets? | 0 | ||||||||||
| How many tansponders? | 0 | ||||||||||
| Will you be using Doppler/GPS navigation? | no | ||||||||||
| - added no on Jun 3, 2010 11:09 AM by Eric Benway | |||||||||||
Winches | |||||||||||
| Trawl Winch with 9/16th trawl wire | |||||||||||
| -added Trawl Winch with 9/16th trawl wire on Jun 3, 2010 11:09 AM by Eric Benway | |||||||||||
Standard Oceanographic Cables | |||||||||||
| |||||||||||
Specialized Deck Equipment | |||||||||||
| |||||||||||
Over the Side Equipment | |||||||||||
| Will you be bringing any equipment (winches, blocks, etc.) that lowers instruments over the side? | yes | ||||||||||
| Details: Jumbo Piston corer with weights, basket and tracks. Possible welding needed on the mob. | |||||||||||
Special Requirements | |||||||||||
| |||||||||||
Additional Cruise Items/Activities | |||||||||||
| Explosive Devices: | no | ||||||||||
| Portable Air Compressors: | no | ||||||||||
| Flammable Gases: | no | ||||||||||
| Small Boat Operations: | no | ||||||||||
| SCUBA Diving Operations: | no | ||||||||||
Hazardous Material | |||||||||||
| Will hazardous material be utilized? | no | ||||||||||
| - added no on Jun 3, 2010 11:09 AM by Eric Benway | |||||||||||
| Describe deployment method and quantity: | |||||||||||
Radioactive Material | |||||||||||
| Radioiosotopes: | no | ||||||||||
Additional Information | |||||||||||
| Is night time work anticipated on this cruise? | yes | ||||||||||
| - added yes on Jun 3, 2010 11:09 AM by Eric Benway | |||||||||||
| Specialized tech support (Seabeam, coring, other): 24 hour coring operations. Two coring technicians are in the science party. | |||||||||||
| - added 24 hour coring operations. Two coring technicians are in the science party. on Jun 3, 2010 11:09 AM by Eric Benway | |||||||||||
| Other required equipment and special needs: | |||||||||||
Checklist & Notes |
Checklist | |
| U.S. Customs Form: | no |
| - added no on Jun 9, 2010 3:18 PM by Eric Benway | |
| Diplomatic Clearance: | no |
| - added no on Jun 9, 2010 3:18 PM by Eric Benway | |
| Date Submitted: | |
| Date Approved: | |
| Agent Information: | |
| Eric Benway Woods Hole Oceanographic Institution 38 Water St. Woods Hole, Ma 02543 T: 508 289 3770 e: ebenway@whoi.edu f: 508-457-2185 | |
| - added Eric Benway Woods Hole Oceanographic Institution 38 Water St. Woods Hole, Ma 02543 T: 508 289 3770 e: ebenway@whoi.edu f: 508-457-2185 on Jun 9, 2010 3:18 PM by Eric Benway | |
| Countries: | |
| n/a | |
| - added n/a on Jun 9, 2010 3:18 PM by Eric Benway | |
| Notes: | |
| n/a | |
| - added n/a on Jun 9, 2010 3:18 PM by Eric Benway | |
| Isotope Use Approval: | no |
| - added no on Jun 9, 2010 3:18 PM by Eric Benway | |
| Isotope Notes: | |
| None | |
| - added None on Jun 9, 2010 3:18 PM by Eric Benway | |
| SCUBA Diving: | no |
| - added no on Jun 9, 2010 3:18 PM by Eric Benway | |
Checklist | |
| SSSG Tech: | |
| tbd | |
| - added tbd on Jun 9, 2010 3:18 PM by Eric Benway | |
| This cruise was originally schd. for URI / Endeavor. Due to the Gulf Oil Spill, the Endeavor was tasked by NSF to go down to the gulf and assist in supporting science. This cruise was then assigned to Oceanus. Jumbo Piston core and track will be welded to 5 deck plates. WHOI Mech Shop will drill the bolt holes in the deck plates once the proper location is decided on June 11. When the deck plates are bolted down, the piston track will be placed on top. Then the track will be welded to the deck plates. After the cruise is over, the tracks and deck plates will need to be cut apart. | |
| - added This cruise was originally schd. for URI / Endeavor. Due to the Gulf Oil Spill, the Endeavor was tasked by NSF to go down to the gulf and assist in supporting science. This cruise was then assigned to Oceanus. Jumbo Piston core and track will be welded to 5 deck plates. WHOI Mech Shop will drill the bolt holes in the deck plates once the proper location is decided on June 11. When the deck plates are bolted down, the piston track will be placed on top. Then the track will be welded to the deck plates. After the cruise is over, the tracks and deck plates will need to be cut apart. on Jun 9, 2010 3:18 PM by Eric Benway | |
| Work order put into shop 6/9/10 - eb. | |
| - added Work order put into shop 6/9/10 - eb. on Jun 9, 2010 3:18 PM by Eric Benway | |