Departure: Aug 28, 2014 | |
Astoria | |
Arrival: Sep 11, 2014 | |
Astoria | |
Operations Area | |
Juan de Fuca Ridge and its flanks | |
- Juan de Fuca Ridge and its flanks on Apr 17, 2014 8:11 AM by Eric Benway | |
Lat/Lon: 44° 45.0′ N / 131° 0.0′ W | |
- set lat to 44° 45.0′ N, set lon to 131° 0.0′ W on Apr 17, 2014 8:11 AM by Eric Benway | |
Depth Range: 2200 / 3200 | |
- set min to 2200, set max to 3200 on Apr 17, 2014 8:11 AM by Eric Benway | |
Will the vessel be operating within 200 NM of a foreign country? | Canada, possibly. |
- Canada, possibly. on Apr 17, 2014 8:11 AM by Eric Benway | |
Are visas or special travel documents required? | no |
- set to no on Apr 17, 2014 8:11 AM by Eric Benway | |
Science Objectives | |
Our aim is to obtain as many and as deep jumbo piston cores as possible to investigate the potential temporal variability of hydrothermal activity on the Juan de Fuca Ridge. COring sites are currently planned to be west of the Juan de Fuca ridge axis. We will also try to obtain high resolution multibeam bathymetry out to a crustal age of 2 million years (~40 miles off-axis from the ridge). | |
- Our aim is to obtain as many and as deep jumbo piston cores as possible to investigate the potential temporal variability of hydrothermal activity on the Juan de Fuca Ridge. COring sites are currently planned to be west of the Juan de Fuca ridge axis. We will also try to obtain high resolution multibeam bathymetry out to a crustal age of 2 million years (~40 miles off-axis from the ridge). on Apr 17, 2014 8:11 AM by Eric Benway | |
Science Activities | |
Jumbo piston coring, box cores, multibeam mapping, possibly some wax coring on the axis of the Juan de Fuca. | |
- Jumbo piston coring, box cores, multibeam mapping, possibly some wax coring on the axis of the Juan de Fuca. on Apr 17, 2014 8:11 AM by Eric Benway | |
Additional Info | |
Pre-cruise Planning Meeting: Teleconference/Visit WHOI | |
- Teleconference/Visit WHOI on Apr 17, 2014 8:11 AM by Eric Benway | |
Meeting Notes: Pre Cruise April 17, 2014. | |
- -changed to Pre Cruise April 17, 2014. on Apr 17, 2014 8:16 AM by Eric Benway | |
- on Apr 17, 2014 8:11 AM by Eric Benway | |
Stations: | |
Station 1 Distance: null Days: null Latitude: Longitude: | |
- added Name: Lat: , Lon: , Distance: , Days: on Apr 17, 2014 8:12 AM by Eric Benway | |
Supporting documentation: | |
»MST_CORE_LOGGER_RAD_AUTHZN.pdf | |
»Langmuir_JPC_deck_plan_prelim.pdf | |
»Langmuir_2014_Cruise_Track.pdf | |
»liftPC.pdf | |
»Pre-Cruise_Meeting_Agenda_AT26-19_-_Langmuir.pdf | |
»ThompsonOSU_JPC.pdf | |
- added MST_CORE_LOGGER_RAD_AUTHZN.pdf on Aug 5, 2014 10:39 AM by Eric Benway | |
- added Langmuir_JPC_deck_plan_prelim.pdf on May 23, 2014 10:52 AM by Eric Benway | |
- added Langmuir_2014_Cruise_Track.pdf on Apr 17, 2014 9:20 AM by Eric Benway | |
- added liftPC.pdf on Apr 17, 2014 9:18 AM by Eric Benway | |
- added Pre-Cruise_Meeting_Agenda_AT26-19_-_Langmuir.pdf on Apr 17, 2014 9:18 AM by Eric Benway | |
- added ThompsonOSU_JPC.pdf on Apr 17, 2014 9:18 AM by Eric Benway |
Funding |
Funding Agency: NSF | |
Grant or contract number: 1338832 |
Scientific Instrumentation for R/V Atlantis |
Shipboard Equipment | |||||||||||
Bathymetry System 12 kHz, | |||||||||||
Bathymetry System 3.5 kHz , | |||||||||||
Deionized Water System, | |||||||||||
12 kHz Pinger for Wire Use, | |||||||||||
Multibeam , | |||||||||||
Navigation - Position, | |||||||||||
Towed Magnetometer | |||||||||||
-added 12 kHz Pinger for Wire Use on Apr 17, 2014 8:11 AM by Eric Benway | |||||||||||
-added Bathymetry System 12 kHz on Apr 17, 2014 8:11 AM by Eric Benway | |||||||||||
-added Bathymetry System 3.5 kHz on Apr 17, 2014 8:11 AM by Eric Benway | |||||||||||
-added Deionized Water System on Apr 17, 2014 8:11 AM by Eric Benway | |||||||||||
-added Multibeam on Apr 17, 2014 8:11 AM by Eric Benway | |||||||||||
-added Navigation - Position on Apr 17, 2014 8:11 AM by Eric Benway | |||||||||||
-added Towed Magnetometer on Apr 17, 2014 8:11 AM by Eric Benway | |||||||||||
Shipboard Communication | |||||||||||
Basic Internet access via HiSeasNet | |||||||||||
-added Basic Internet access via HiSeasNet on Apr 17, 2014 8:11 AM by Eric Benway | |||||||||||
Critical CTD Sensors | |||||||||||
Sediment Sampling | |||||||||||
Box corer, | |||||||||||
Gravity corers, | |||||||||||
Multi-core, | |||||||||||
Rock dredges | |||||||||||
-added Box corer on Apr 17, 2014 8:11 AM by Eric Benway | |||||||||||
-added Gravity corers on Apr 17, 2014 8:11 AM by Eric Benway | |||||||||||
-added Multi-core on Apr 17, 2014 8:11 AM by Eric Benway | |||||||||||
-added Rock dredges on Apr 17, 2014 8:11 AM by Eric Benway | |||||||||||
Storage Notes: I am not sure of the storage requirements for the cores on board. We should discuss at pre-cruise. | |||||||||||
- added I am not sure of the storage requirements for the cores on board. We should discuss at pre-cruise. on Apr 17, 2014 8:11 AM by Eric Benway | |||||||||||
Navigation | |||||||||||
Will you be using Long Base Line (LBL) navigation? | no | ||||||||||
- added no on Apr 17, 2014 8:11 AM by Eric Benway | |||||||||||
How many nets? | null | ||||||||||
How many tansponders? | null | ||||||||||
Will you be using Ultra-short baseline (USBL) navigation? | no | ||||||||||
- added no on Apr 17, 2014 8:11 AM by Eric Benway | |||||||||||
Navigation | |||||||||||
GPS | |||||||||||
-added GPS on Apr 17, 2014 8:11 AM by Eric Benway | |||||||||||
Navigation Notes: | |||||||||||
Winches | |||||||||||
Hydro Winch with .25" hydro wire, | |||||||||||
Trawl Winch with 9/16th trawl wire | |||||||||||
-added Hydro Winch with .25" hydro wire on Apr 17, 2014 8:11 AM by Eric Benway | |||||||||||
-added Trawl Winch with 9/16th trawl wire on Apr 17, 2014 8:11 AM by Eric Benway | |||||||||||
Winch Notes: | |||||||||||
Wire use and application | |||||||||||
Trawl Winch with 9/16th trawl wire | |||||||||||
-added Trawl Winch with 9/16th trawl wire on Apr 17, 2014 8:11 AM by Eric Benway | |||||||||||
Winch Notes: Need to get detailed requirements from OSU coring team. | |||||||||||
- added Need to get detailed requirements from OSU coring team. on Apr 17, 2014 8:11 AM by Eric Benway | |||||||||||
Standard Oceanographic Cables | |||||||||||
| |||||||||||
Portable Vans | |||||||||||
Cold Storage Van | |||||||||||
-added Cold Storage Van on Apr 17, 2014 8:15 AM by Eric Benway | |||||||||||
Specialized Deck Equipment | |||||||||||
| |||||||||||
Over the Side Equipment | |||||||||||
Will you be bringing any equipment (winches, blocks, etc.) that lowers instruments over the side? | no | ||||||||||
Special Requirements | |||||||||||
| |||||||||||
Additional Cruise Items/Activities | |||||||||||
Explosive Devices: | no | ||||||||||
Portable Air Compressors: | no | ||||||||||
Flammable Gases: | no | ||||||||||
Small Boat Operations: | no | ||||||||||
SCUBA Diving Operations: | no | ||||||||||
Hazardous Material | |||||||||||
Will hazardous material be utilized? | no | ||||||||||
- added no on Apr 17, 2014 8:11 AM by Eric Benway | |||||||||||
Describe deployment method and quantity: Core Logger - rad authorization to put on board and use. | |||||||||||
- added Core Logger - rad authorization to put on board and use. on Apr 17, 2014 8:15 AM by Eric Benway | |||||||||||
Radioactive Material | |||||||||||
Radioiosotopes: | yes | ||||||||||
Additional Information | |||||||||||
Is night time work anticipated on this cruise? | yes | ||||||||||
- added yes on Apr 17, 2014 8:11 AM by Eric Benway | |||||||||||
Specialized tech support (Seabeam, coring, other): We will be Seabeam support as we will be generating high resolution seabeam maps. The cruise is primarily a coring cruise, but if coring needs a break, we would potential dredge, rock core, and map. | |||||||||||
- added We will be Seabeam support as we will be generating high resolution seabeam maps. The cruise is primarily a coring cruise, but if coring needs a break, we would potential dredge, rock core, and map. on Apr 17, 2014 8:11 AM by Eric Benway | |||||||||||
Other required equipment and special needs: We will need wax coring capability. There is a wax core stand at WHOI, and should be the necessary modified gravity cores as well. | |||||||||||
- added We will need wax coring capability. There is a wax core stand at WHOI, and should be the necessary modified gravity cores as well. on Apr 17, 2014 8:11 AM by Eric Benway |
Checklist & Notes |
Checklist | |
U.S. Customs Form: | no |
- added no on Apr 17, 2014 8:15 AM by Eric Benway | |
Diplomatic Clearance: | no |
- added no on Apr 17, 2014 8:15 AM by Eric Benway | |
Date Submitted: | |
Date Approved: | |
Agent Information: | |
United States (Astoria, OR)Master R/V ATLANTIS Esther Jones, Administrative Assistant Port of Astoria Direct Line: (503) 741-3300 | |
- added United States (Astoria, OR)Master R/V ATLANTIS Esther Jones, Administrative Assistant Port of Astoria Direct Line: (503) 741-3300 | |
Countries: | |
USA | |
- added USA on Apr 17, 2014 8:15 AM by Eric Benway | |
Notes: | |
None Req. | |
- added None Req. on Apr 17, 2014 8:15 AM by Eric Benway | |
Isotope Use Approval: | yes |
- added yes on Apr 17, 2014 8:15 AM by Eric Benway | |
Isotope Notes: | |
Core Logger - Rad Auth. Req. | |
- added Core Logger - Rad Auth. Req. on Apr 17, 2014 8:15 AM by Eric Benway | |
SCUBA Diving: | no |
- added no on Apr 17, 2014 8:15 AM by Eric Benway | |
Checklist | |
SSSG Tech: | |
Dave Simms, Ellen Roosen | |
- added Dave Simms, Ellen Roosen on Apr 17, 2014 8:15 AM by Eric Benway | |
2 day mobe Aug 26 & 27 2 day demobe Sept 12. | |
- added 2 day mobe Aug 26 & 27 2 day demobe Sept 12. on Apr 17, 2014 8:15 AM by Eric Benway | |