Woods Hole Oceanographic Institution
Cruise Planning Synopsis
AT40-01: Alvin/Sentry Engineering | |
Ship | |
R/V Atlantis | |
Vehicles | |
AUV Sentry, HOV Alvin | |
Cruise Party | |
Bruce Strickrott: Chief Scientist, Principal Investigator Organization Name USA +1 508 289 4831 strickrott@whoi.edu |
Departure: Apr 28, 2018 | |
Woods Hole | |
Arrival: May 8, 2018 | |
St George, Bermuda | |
Operations Area | |
Northeast US continental slope, Bermuda operations areas | |
Lat/Lon: | |
Depth Range: min / max (m) | |
Will the vessel be operating within 200 NM of a foreign country? | Burmuda |
Are visas or special travel documents required? | no |
Science Objectives | |
Principal objectives for the Alvin dive program are as follows: 1) perform vehicle testing and trials of DSV Alvin and associated support systems (LARS, USBL, Communications, science gear, etc) after the long non-operational period, will include progressive dive depth increases with a dive to Alvin max depth (4500 m) 2) perform directed training of existing and new personnel to advance technical and operational readiness and advancement toward DSV pilot certification 3) perform on-going new systems integration and engineering tests (thrusters, acoustic modem, video improvements, in-hull computer upgrades and other systems) 4) perform in-water tests of the Operations Vehicle 5) perform joint vehicle operations (Alvin & SENTRY) and as possible concurrent vehicle operations 6) ensure readiness for the follow on Mark Kurz scienctific diving series 7) as possible obtain footage and media for use in the on going vehicle outreach efforts 8) execute the opportunity to include NSF/ONR/WHOI participation on the cruise as possible and practical | |
Science Activities | |
no official science objectives are associated with the Alvin efforts - no sampling or equipment placement planned | |
Additional Info | |
Pre-cruise Planning Meeting: Visit WHOI | |
Media personnel on board: Video, Writer, possible NPR participation (TBD) | |
Cruise plan is awaiting possible participation by a private IMAX film maker. We are also considering WHOI/AIVL participation (Lu Lamar), communications (Ken Kostel) and the potential to bring a WCAI representative/correspondent along | |
Stations: | |
Supporting documentation: |
Funding |
Funding Agency: NSF | |
Grant or contract number: xxx | |
Funding Agency: ONR/NAVY | |
Grant or contract number: xxx |
Scientific Instrumentation for R/V Atlantis |
Shipboard Equipment | |||||||||||
Sippican XBT System (Mark 21) | |||||||||||
Transponder Navigation - Sonardyne USBL | |||||||||||
Navigation - Heading | |||||||||||
Multibeam | |||||||||||
Navigation - Position | |||||||||||
Shipboard Communication | |||||||||||
Basic Internet access via HiSeasNet | |||||||||||
Critical CTD Sensors | |||||||||||
Storage Notes: | |||||||||||
Navigation | |||||||||||
Will you be using Long Base Line (LBL) navigation? | no | ||||||||||
How many nets? | null | ||||||||||
How many tansponders? | null | ||||||||||
Will you be using Ultra-short baseline (USBL) navigation? | no | ||||||||||
Navigation | |||||||||||
USBL | |||||||||||
Navigation Notes:
Sentry Requires use of the Ranger USBL system. Integration with the recently installed Ranger2 system should be discussed during the pre-cruise meeting. Alvin requests basic multibeam maps of the dive areas as possible/practical | |||||||||||
Winches | |||||||||||
Trawl Winch with .681 fiber optic | |||||||||||
Winch Notes: OV will use 0.681" winch for testing and trials | |||||||||||
Wire use and application | |||||||||||
Trawl Winch with .681 fiber optic | |||||||||||
Winch Notes: OV operations with 0.681" F0 cable and new Alvin slip-ring | |||||||||||
Standard Oceanographic Cables | |||||||||||
|
Science Van 1 | |||
Type/size: 20' Container | Location: Main Deck port side aft | ||
Water: No | Power:480v | ||
Science Van 2 | |||
Type/size: 20' Container | Location: Any available space | ||
Water: NO | Power:NO |
Specialized Deck Equipment
Mooring Deployment/Recovery Equipment Required: no | Type: |
Cruise Specific Science Winch Required: no | Type: |
Nets Required: no | Type: |
Over the Side Equipment
Special Requirements
Elecrical Power: yes | Identify 480v AC feed for Sentry container. |
Equipment Handling: no | Identify: |
Inter/intraship Communications: no | Identify: |
Science Stowage: no | Identify: |
Water: no | Identify: |
Additional Cruise Items/Activities
Hazardous Material
Radioactive Material
Additional Information
Sentry is expected to dive during the night while Alvin is out of the water. Operations are expected to take place at any point during the night and an extra Bosun is requested for Sentry Launch and Recovery operations from 18:00 through 07:00 on the following day. Due to additional Sentry personell, Sentry can fulfill tag line and tugger operations. If the AB on watch can operate the crane, we should only need a bosun that can work a night shift.
possible use of an ALvin elevator for OV testing and possible camera work (as possible/practical with prioritized ALVIN and SENTRY operations)
Scientific Instrumentation for HOV Alvin |
Site Survey | |
Will you provide detailed charts of the work area(s)? | no |
If no, willl you need R/V Atlantis to generate maps of the work area(s)? | no |
Will you need post-dive maps of the work area generated? | no |
Navigation | |
Will you be using Long Base Line (LBL) navigation? | no |
How many nets? | null |
How many tansponders? | null |
Will you be using Ultra-short baseline (USBL) navigation for other than Alvin operations? | no |
Elevators | |
Will you be using elevators to transport samples to the surface? | no |
If yes, how many would you anticipate? | |
Science Supplied Equipment | |
Are you supplying equipment to be used on HOV Alvin | no |
Has this equipment been used on Alvin before? | no |
Please give a brief description of the equipment, its intended purpose, the cruise # it was last used on if any and its deployment method. | |
Does this equipment use an external pressure housing? | no |
Has the pressure housing been tested per Alvin Pressure Test requirements? | no |
Pressure housing schematic with dimensions and include air and water weights. | |
Air weight of this equipment? | |
Water weight of this equipment? | |
Does the equipment require a power interface from Alvin? | no |
Voltage required | |
Power required | |
Data Interface | null|
Does the equipment meet the electrical requirements of the Alvin User Manual? | no |
Please provide power and comms specifics, wiring diagram, pinout, and wiring harness in advance of the cruise. | |
Does this equipment require hydraulic inputs from the vehicle? | no |
Hydraulic schematic of the equipment requirements. | |
Does this equipment require manipulation? | no |
If yes, please describe how the equipment is to be manipulated: | |
Will this equipment be deployed off the vehicle? | no |
If yes, please describe how the equipment is intended for deployment: | |
If yes, will the equipment be disconnected from the vehicle and left in situ? | no |
How long will the deployment be? | |
Will the equipment be recovered by the same vehicle? | no |
Do you intend to recover any other previously deployed equipment? | no |
If yes, please describe this equipment: | |
Does this equipment use any glass spheres for either buoyancy or as pressure housings? | no |
Does the equipment have an associated computer or control panel for remote operation from the personnel sphere? | no |
Has the computer or control panel been gas tested for use in the personnel sphere? | no |
Hazardous Material | |
Will hazardous material be utilized? | no |
Describe deployment method and quantity: | |
Additional Information | |
Brief operations description or comments: | |
Navy Clearance: Granted 04/13/2018:
Within 10 NM radius of 39-48N 069-36W during period 280000Q thru 302400Q APR 18 Within 30 NM radius of 32-37N 064-33W during period 300000Q APR thru 082400Q MAY 18 |
Scientific Instrumentation for AUV Sentry |
Site Survey | |
Will you provide detailed charts of the work area(s)? | yes |
If no, willl you need R/V Atlantis to generate maps of the work area(s)? | no |
Will you need post-dive maps of the work area generated? | no |
Navigation | |
Will you be using Long Base Line (LBL) navigation? | no |
How many nets? | null |
How many tansponders? | null |
Will you be using Ultra-short baseline (USBL) navigation? | no |
Will you be using Doppler/GPS navigation? | no |
Science Supplied Equipment | |
Are you supplying equipment to be used on HOV AbeSentry | no |
Has this equipment been used on AbeSentry before? | no |
Please give a brief description of the equipment, its intended purpose, the cruise # it was last used on if any and its deployment method. | |
Does this equipment use an external pressure housing? | no |
Has the pressure case been tested to the anticipated depth of deployment?& | no |
Pressure housing schematic with dimensions and include air and water weights. | |
Air weight of this equipment? | |
Water weight of this equipment? | |
Does the equipment require data or a power interface from the vehicle? | no |
Does the equipment meet the electrical requirements of the Sentry User Manual? | no |
Additional Information | |
Brief operations description or comments: 1. Sentry will use Alvin SP23 transducer for LBL comms. Whichever transducer isnt working correctly 2. Sentry will plan to use and tie into uModem on ship 3. Sentry personell will occupy hydrolab - port aft lab 4. Access to 'Alvin Net' in Hydro lab to access USBL system 5. Main Deck container requires 480v AC power, typically using supply connector by hydroboom controlls on main deck |
Checklist & Notes |
Checklist | |
U.S. Customs Form: | no |
Diplomatic Clearance: | no |
Date Submitted: | |
Date Approved: | |
Agent Information: | |
Countries: | |
Notes: | |
Isotope Use Approval: | no |
Isotope Notes: | |
SCUBA Diving: | no |
Checklist | |
SSSG Tech: | |