Woods Hole Oceanographic Institution
Cruise Planning Synopsis
AT 15-67 | |
Ship | |
R/V Atlantis | |
Vehicles | |
PI: Raymond Lee, Marvin Lilley, Maurice Tivey | |
HOV Alvin | |
PI: | |
HOV Alvin | |
Cruise Party | |
PI: Raymond Lee, Marvin Lilley, Maurice Tivey | |
Raymond Lee: Principal Investigator, Chief Scientist Washington State University Pullman, WA USA 99164 +1 509 335 5727 rwlee@wsu.edu Marvin Lilley: Principal Investigator University of Washington School of Oceanography P.O. BOX 355351 Seattle, WA USA 98195 +1 206 543 0959 lilley@u.washington.edu Maurice Tivey: Principal Investigator Woods Hole Oceanographic Institution Clark 256, MS#22 Woods Hole, Ma. USA 02543 +1 508 289 4845 mtivey@whoi.edu | |
PI: |
Departure: Jul 6, 2010 | |
PI: Raymond Lee, Marvin Lilley, Maurice Tivey | |
astoria | |
PI: | |
Astoria, Oregon | |
Arrival: Jul 26, 2010 | |
PI: Raymond Lee, Marvin Lilley, Maurice Tivey | |
astoria | |
PI: | |
Astoria, Oregon | |
Operations Area | |
PI: Raymond Lee, Marvin Lilley, Maurice Tivey | |
Main Endeavour Vent Field, possibly Middle Valley | |
Lat/Lon: 47° 57.0′ N / 129° 5.0′ W | |
Depth Range: 2000 / 2200 | |
Will the vessel be operating within 200 NM of a foreign country? | canada |
Are visas or special travel documents required? | no |
PI: | |
Northeast Pacific | |
Lat/Lon: 47° 54.0′ N / 128° 36.0′ W | |
Depth Range: 2650 / max (m) | |
Will the vessel be operating within 200 NM of a foreign country? | Canada |
Are visas or special travel documents required? | no |
Science Objectives | |
PI: Raymond Lee, Marvin Lilley, Maurice Tivey | |
Macrofauna physiology studies, environmental temperature and chemistry characterization, sediment collection | |
PI: | |
1) To install a seafloor optical communication device at a CORK instrumented borehole well-head (nominally Hole 1025C 47.887450 deg. N, 128.648650 deg. W). 2) To carry out a series of communication tests between the seafloor device and the submersible Alvin. 3) Test a ship-based CTD-wire version of the optical communication device lowered to the seafloor in the vicinity of the CORK to test a remote mode of communications. 4) Test optical ranges within the Endeaour rift valley using Alvin | |
Science Activities | |
PI: Raymond Lee, Marvin Lilley, Maurice Tivey | |
Macrofauna collections, deploy camera temperature sensor arrays, water samples, in situ mass spectrometer | |
PI: | |
3 Dives Dive-1 install and test CORK 1025C optical communication device Dive-2 finish range testing at CORK 1025C Dive-3 Endeavour Ridge dive with portable Optical comms unit 2 days of night time operations for CTD wire lowered optical comms unit at CORK 1025C | |
Additional Info | |
PI: Raymond Lee, Marvin Lilley, Maurice Tivey | |
Pre-cruise Planning Meeting: Teleconference | |
PI: | |
Pre-cruise Planning Meeting: Visit WHOI | |
Meeting Notes: Already here at WHOI | |
Stations: | |
PI: | |
Station 1 Distance: 300 Days: null Latitude: 47° 53.0 N Longitude: 128° 39.0 W | |
Supporting documentation: | |
PI: Raymond Lee, Marvin Lilley, Maurice Tivey | |
PI: |
Funding |
PI: Raymond Lee, Marvin Lilley, Maurice Tivey | |
Funding Agency: NSF | |
Grant or contract number: OCE-0623554 | |
PI: | |
Funding Agency: NSF | |
Grant or contract number: OCE-0926849 |
Scientific Instrumentation for R/V Atlantis |
Shipboard Equipment | |||||||||||
PI: Raymond Lee, Marvin Lilley, Maurice Tivey | |||||||||||
Deionized Water System | |||||||||||
Science Underway Seawater System | |||||||||||
Fume Hood | |||||||||||
PI: | |||||||||||
Relay Transponder for Wire Use | |||||||||||
Navigation - Position | |||||||||||
PI: Raymond Lee, Marvin Lilley, Maurice Tivey | |||||||||||
PI: | |||||||||||
PI: Raymond Lee, Marvin Lilley, Maurice Tivey | |||||||||||
PI: | |||||||||||
CTD/Water Sampling | |||||||||||
PI: Raymond Lee, Marvin Lilley, Maurice Tivey | |||||||||||
911+ Rosette 24-position, 10-liter bottle Rosette with dual T/C sensors | |||||||||||
Critical CTD Sensors | |||||||||||
PI: Raymond Lee, Marvin Lilley, Maurice Tivey | |||||||||||
PI: | |||||||||||
CTD wire and frame for mounting optical comms unit | |||||||||||
Sediment Sampling | |||||||||||
PI: Raymond Lee, Marvin Lilley, Maurice Tivey | |||||||||||
Gravity corers | |||||||||||
Sample Storage | |||||||||||
PI: Raymond Lee, Marvin Lilley, Maurice Tivey | |||||||||||
Scientific Walk-in Freezer | |||||||||||
Climate Controlled Walk-in | |||||||||||
Refrigerator 8.6 cu. ft. | |||||||||||
Freezer -70°C 3.2 cu. ft. ea. | |||||||||||
Freezer -70°C 25 cu. ft. | |||||||||||
PI: Raymond Lee, Marvin Lilley, Maurice Tivey | |||||||||||
PI: | |||||||||||
Navigation | |||||||||||
PI: Raymond Lee, Marvin Lilley, Maurice Tivey | |||||||||||
Will you be using Long Base Line (LBL) navigation? | no | ||||||||||
How many nets? | 0 | ||||||||||
How many tansponders? | 0 | ||||||||||
Will you be using Ultra-short baseline (USBL) navigation? | no | ||||||||||
PI: | |||||||||||
Will you be using Long Base Line (LBL) navigation? | yes | ||||||||||
How many nets? | 1 | ||||||||||
How many tansponders? | 2 | ||||||||||
Will you be using Ultra-short baseline (USBL) navigation? | yes | ||||||||||
PI: Raymond Lee, Marvin Lilley, Maurice Tivey | |||||||||||
PI: | |||||||||||
Winches | |||||||||||
PI: | |||||||||||
CTD Winch with .322" Electro-mechanical wire | |||||||||||
PI: Raymond Lee, Marvin Lilley, Maurice Tivey | |||||||||||
PI: | |||||||||||
PI: Raymond Lee, Marvin Lilley, Maurice Tivey | |||||||||||
PI: | |||||||||||
Winch Notes: Not sure of this at the present time. | |||||||||||
Standard Oceanographic Cables | |||||||||||
PI: Raymond Lee, Marvin Lilley, Maurice Tivey | |||||||||||
| |||||||||||
PI: | |||||||||||
|
Science Van 1 | |||
Type/size: Girguis pressure van | Location: deck | ||
Water: | Power: | ||
Science Van 2 | |||
Type/size: Girguis pressure van | Location: deck | ||
Water: | Power: |
Specialized Deck Equipment
PI: Raymond Lee, Marvin Lilley, Maurice Tivey
Mooring Deployment/Recovery Equipment Required: no | Type: |
Cruise Specific Science Winch Required: no | Type: |
Nets Required: no | Type: |
PI:
Mooring Deployment/Recovery Equipment Required: no | Type: |
Cruise Specific Science Winch Required: no | Type: |
Nets Required: no | Type: |
Over the Side Equipment
PI: Raymond Lee, Marvin Lilley, Maurice Tivey
PI:
Special Requirements
PI: Raymond Lee, Marvin Lilley, Maurice Tivey
Elecrical Power: no | Identify |
Equipment Handling: no | Identify: |
Inter/intraship Communications: no | Identify: |
Science Stowage: no | Identify: |
Water: no | Identify: |
PI:
Elecrical Power: no | Identify |
Equipment Handling: no | Identify: |
Inter/intraship Communications: no | Identify: |
Science Stowage: no | Identify: |
Water: no | Identify: |
Additional Cruise Items/Activities
PI: Raymond Lee, Marvin Lilley, Maurice Tivey
PI:
Hazardous Material
PI: Raymond Lee, Marvin Lilley, Maurice Tivey
PI:
Radioactive Material
PI: Raymond Lee, Marvin Lilley, Maurice Tivey
PI:
Additional Information
PI: Raymond Lee, Marvin Lilley, Maurice Tivey
night CTD in vent plume and off axis, gravity coring
PI:
CTD operations for lowering optical comms unit on CTD winch/frame. need realtime communications and USBL for positioning
Scientific Instrumentation for HOV Alvin |
Site Survey | |
PI: Raymond Lee, Marvin Lilley, Maurice Tivey | |
Will you provide detailed charts of the work area(s)? | no |
If no, willl you need R/V Atlantis to generate maps of the work area(s)? | no |
Will you need post-dive maps of the work area generated? | no |
PI: | |
Will you provide detailed charts of the work area(s)? | no |
If no, willl you need R/V Atlantis to generate maps of the work area(s)? | no |
Will you need post-dive maps of the work area generated? | no |
Navigation | |
PI: Raymond Lee, Marvin Lilley, Maurice Tivey | |
Will you be using Long Base Line (LBL) navigation? | yes |
How many nets? | 0 |
How many tansponders? | 0 |
Will you be using Ultra-short baseline (USBL) navigation for other than Alvin operations? | no |
PI: | |
Will you be using Long Base Line (LBL) navigation? | yes |
How many nets? | 1 |
How many tansponders? | 2 |
Will you be using Ultra-short baseline (USBL) navigation for other than Alvin operations? | yes |
Vehicle Equipment | |
PI: Raymond Lee, Marvin Lilley, Maurice Tivey | |
Major (dual) pair water sampler(s) with ICL temperature probles | |
Large capacity slurp samplers: single-chamber | |
Large capacity slurp samplers: multi-chamber | |
Bio collection boxes: 12 x 12 x 12 | |
Bio collection boxes: 12 x 12 x 24 | |
Push corers (12-pack rack) | |
High temperature probe (0-480°C) | |
Scoop nets | |
Vehicle Equipment | |
PI: Raymond Lee, Marvin Lilley, Maurice Tivey | |
Major (dual) pair water sampler(s) with ICL temperature probles | |
Large capacity slurp samplers: single-chamber | |
Large capacity slurp samplers: multi-chamber | |
Bio collection boxes: 12 x 12 x 12 | |
Bio collection boxes: 12 x 12 x 24 | |
Push corers (12-pack rack) | |
High temperature probe (0-480°C) | |
Scoop nets | |
Elevators | |
PI: Raymond Lee, Marvin Lilley, Maurice Tivey | |
Will you be using elevators to transport samples to the surface? | yes |
If yes, how many would you anticipate? | 1 |
PI: | |
Will you be using elevators to transport samples to the surface? | yes |
If yes, how many would you anticipate? | 0 |
Science Supplied Equipment | |
PI: Raymond Lee, Marvin Lilley, Maurice Tivey | |
Are you supplying equipment to be used on HOV Alvin | yes |
Has this equipment been used on Alvin before? | yes |
Please give a brief description of the equipment, its intended purpose, the cruise # it was last used on if any and its deployment method.
in situ mass spec, AT-15-51 | |
Does this equipment use an external pressure housing? | yes |
Has the pressure housing been tested per Alvin Pressure Test requirements? | yes |
Pressure housing schematic with dimensions and include air and water weights. | |
Air weight of this equipment? | 170 |
Water weight of this equipment? | null|
Does the equipment require a power interface from Alvin? | yes |
Voltage required null | |
Power required | null|
Data Interface | null|
Does the equipment meet the electrical requirements of the Alvin User Manual? | no |
Please provide power and comms specifics, wiring diagram, pinout, and wiring harness in advance of the cruise. | |
Does this equipment require hydraulic inputs from the vehicle? | no |
Hydraulic schematic of the equipment requirements. | |
Does this equipment require manipulation? | no |
If yes, please describe how the equipment is to be manipulated: | |
Will this equipment be deployed off the vehicle? | no |
If yes, please describe how the equipment is intended for deployment: | |
If yes, will the equipment be disconnected from the vehicle and left in situ? | no |
How long will the deployment be? | |
Will the equipment be recovered by the same vehicle? | no |
Do you intend to recover any other previously deployed equipment? | no |
If yes, please describe this equipment: | |
Does this equipment use any glass spheres for either buoyancy or as pressure housings? | no |
Does the equipment have an associated computer or control panel for remote operation from the personnel sphere? | yes |
Has the computer or control panel been gas tested for use in the personnel sphere? | yes |
PI: | |
Are you supplying equipment to be used on HOV Alvin | yes |
Has this equipment been used on Alvin before? | no |
Please give a brief description of the equipment, its intended purpose, the cruise # it was last used on if any and its deployment method.
We will being deploying a seafloor optical communications unit at the CORK wellhead 1025C using ALVIN. We will also use a matching comms unit mounted on the HOV to receive realtime data inside the sphere. The equipment is being built at present and so weights are TBD. | |
Does this equipment use an external pressure housing? | yes |
Has the pressure housing been tested per Alvin Pressure Test requirements? | no |
Pressure housing schematic with dimensions and include air and water weights. | |
Air weight of this equipment? | null|
Water weight of this equipment? | null|
Does the equipment require a power interface from Alvin? | yes |
Voltage required null | |
Power required | null|
Data Interface | null|
Does the equipment meet the electrical requirements of the Alvin User Manual? | yes |
Please provide power and comms specifics, wiring diagram, pinout, and wiring harness in advance of the cruise. | |
Does this equipment require hydraulic inputs from the vehicle? | no |
Hydraulic schematic of the equipment requirements. | |
Does this equipment require manipulation? | yes |
If yes, please describe how the equipment is to be manipulated:
The seafloor optical comms unit will need to be installed with an Underwater mateable connector to the exisiting data logger unit at the CORK. | |
Will this equipment be deployed off the vehicle? | yes |
If yes, please describe how the equipment is intended for deployment:
The seafloor optical comms unit is a stand alone unit with its own battery pack. It will communicate using light (LED-based) with an optical receiver installed on the HOV. The optical rcvr will be wired into the sub to receive data inside the sphere for testing. | |
If yes, will the equipment be disconnected from the vehicle and left in situ? | yes |
How long will the deployment be? | 12 Months |
Will the equipment be recovered by the same vehicle? | yes |
Do you intend to recover any other previously deployed equipment? | no |
If yes, please describe this equipment: We will deploy the seafloor optical comms unit at the CORK 1025C well head. Wi will hook up this unit to the exisiting data logger and then leave the unit in place for nominally one year. The plan would be to revisit with Jason in 2011 to retrieve data and retrieve the unit, to rebattery and to reinstall for another year. | |
Does this equipment use any glass spheres for either buoyancy or as pressure housings? | no |
Does the equipment have an associated computer or control panel for remote operation from the personnel sphere? | yes |
Has the computer or control panel been gas tested for use in the personnel sphere? | no |
Hazardous Material | |
PI: Raymond Lee, Marvin Lilley, Maurice Tivey | |
Will hazardous material be utilized? | no |
Describe deployment method and quantity: | |
PI: | |
Will hazardous material be utilized? | no |
Describe deployment method and quantity: | |
Additional Information | |
PI: Raymond Lee, Marvin Lilley, Maurice Tivey | |
Brief operations description or comments: May leave high pressure van on ship until WHOI if possible | |
Navy Clearance: Granted 07/02/10: WITHIN 3.5 NM RADIUS OF 47-57N 129-03W DURING PERIOD 060000T THRU 262400T JUL 10 WITHIN 10 NM RADIUS OF 48-28N 128-42W DURING PERIOD 060000T THRU 262400T JUL 10 WITHIN 10 NM RADIUS OF 45-58N 130-00W DURING PERIOD 060000T THRU 262400T JUL 10 WITHIN 1 NM RADIUS OF 47-53N 128-39W DURING PERIOD 060000T THRU 262400T JUL 10 WITHIN 3 NM RADIUS OF 47-57N 129-06W DURING PERIOD 060000T THRU 262400T JUL 10 | |
PI: | |
Brief operations description or comments: | |
Navy Clearance: |
Checklist & Notes |
Checklist | |
U.S. Customs Form: | no |
Diplomatic Clearance: | no |
Date Submitted: | |
Date Approved: | |
Agent Information: | |
Countries: | |
Notes: | |
Isotope Use Approval: | no |
Isotope Notes: | |
SCUBA Diving: | no |
Checklist | |
SSSG Tech: | |