| Prior to deployment, the author is silhouetted installing the ULS
instrument into the top spherical float.
Photo by Rick Krishfield, WHOI. |
 |
| Bosun Rico Amamio signals the crane operator to stop lowering, so
that Will Ostrom can hook the chain stopper to the string of floats.
Photo by Rick Krishfield, WHOI. |
 |
| Dan McLean, Terry Rhyno, and Chief Officer John Jenner watch for
the end of the spool of wire rope, when it will be time for changing reels. Photo by Rick Krishfield, WHOI. |
 |
| Will Ostrom, Rick Krishfield, and Rico Amamio muscle the profiler
instrument onto the mooring wire for another year-long deployment. Photo by Rick Krishfield, WHOI. |
| |
Cruise - 2006 Dispatches
Calendar
Dispatch 20, August 24, 2006
By Kris Newhall, WHOI
Back to (Mooring) Work
After spending five of the previous days in beautifully sunny and
clear weather adrift, wouldn't you know it, today I awoke to somewhat
cloudy, foggy, and much cooler weather. As I looked out the ship's
starboard window I thought to myself, "It must be a mooring day!"
In fact, the ship was on station early Thursday morning to initially
survey the area in hopes of finding a clear opening so that the WHOI mooring
team, along with the ship's crew and officers, could get to work and deploy
Mooring A, the first of four WHOI moorings that was recovered (see Dispatch
13), then will be deployed this cruise. For a mooring recovery, the Captain
needs to spend more time breaking ice and trying to create the largest open
water pond as possible. But for a deployment, minimal ice needs to be
broken and only a small open water area is needed. Furthermore, the ship
uses its Wartsila Bubbler System to push any impeding ice away from the
deployment area. Much of the morning, therefore, is spent on deck work;
i.e., connecting the acoustic releases and bottom pressure recorder (BPR) to
the anchor, assembling the Benthos floatation spheres and organizing them
for deployment, and installing the upward looking sonar (ULS) in the top
sphere. Also, all of the wooden reels which contain the mooring's jacketed
wire rope are assembled, staged, and organized by their serial number. This
is important because the mooring's recorder has to keep track of which wire
shot is going over the side and when.
Traditionally, for most sub surface moorings around the world, where
the length of the mooring can be trailed out behind the ship before the
anchor is launched, the top floats are deployed first and the anchor last.
This keeps the tension on the wire low during the entire operation.
However, because of high concentrations of sea ice in these remote areas of
the Beaufort Sea, the mooring must be deployed vertically from the ship's
starboard A-frame with the anchor going over the side first. To safely
handle the extra tension, we employ a specially designed Lebus winch.
After lunch, we are in position and the crew is ready. Because the
mooring is approximately 3,800 m (over 2 miles) long, there are many wooden
reels of wire (most consisting of 500 meter, or 1600 ft, lengths) that need
to be added to the mooring as we progress. In order to add these wire
shots, the process requires that we stop the mooring off, in other words, to
take the weight off of the winch using a 'Yale' grip, which holds the wire,
essentially holding the mooring in place. Changing reels is an integral
part of both the recovery and deployment process and requires the aid of
everyone on deck.
Finally, when almost half of the wire is already in the water, it's
time to put the McLane Moored Profiler (MMP) on the 1,995 m (over 1 mile)
shot of wire. The MMP is the instrument responsible for profiling the water
column to obtain measurements of temperature, salinity, and currents versus
pressure. Above the profiler there is an acoustic transponder, just below
the top sphere, which aids in the recovery process. By sending acoustic
signals in the water, much like the releases, the transponder tells us where
the top sphere is located.
When everyone, including the Captain, was ready, the top sphere was
moved into position and shackled to the mooring. Using a quick release
hook, the sphere was lowered to the surface and released; it took
approximately 30-40 seconds for the anchor to take the mooring to the
bottom. Now the mooring will patiently wait for recovery next year, and
hopefully will compile as much useful data as it did this year.
|
|